Novo Nordisk A/S
Send to a friendPrint

NNHF Project Application Form


NNHF project applications should be based on the NNHF project application form

The structure of the project should adhere to general project management principles, i.e.

  • Based on a project plan with defined activities, deliverables, timelines, responsibilities and clear budget allocation
  • Ensure delivery of clear results within the first year

Project needs to prove sustainability

Project should be concentrated on one centre rather than several centres. National or regional projects may be carried out upon separate application after local or single-centre pilot projects have been shown to be successful

Project duration: no general limitation in length of time; periods of one to a maximum of three years duration preferred

 


 

Downloads

Here, you can download the following documents about the NNHF:

•  NNHF Project Guidelines
•  NNHF Project Application Form

Application timelines:

At the latest 12 weeks to NNHF Council Meetings.

NNHF Council Meetings:
2008: 15 Jan, 08 May, 
         12 Sept, 25 Nov